Facilities Services projects for Summer 2009 include:


completed Infrastructure:  Repair older cooling towers and fins
Replace chilled water isolation valve to allow chilled water line to be isolated for repairs

completed Infrastructure: Revive deep well pump with ROI unit for future use as chilled water and steam for energy savings and possible emergency continuity

completed Infrastructure:  Fogelman drainage - Supports McAlister Place (unified green) project

completed #2 Audubon:  Replace doors to match existing.  Remove chimney for safety (back side of house)

completedAnthropology: Paint exterior (completes block)

completed Boggs:  Building envelope/brick repair - will match existing (back side of building)

completedButler:  Repair existing windows to allow for original function

completedDixon Hall:  Replace front door to match existing

completed Gibson Hall:  HVAC upgrade - direct replacement
 Electrical upgrade - to support HVAC upgrade

completedLaw School:  Water intrusion (interior work)

completedMcAlister:  Waterproof building - repair & repoint stone
      New loading dock to support events

completedNavy/ROTC:  Paint windows

completedNewcomb Hall:  Elevator - presented design to CDRC.  Replace fire alarm system.

completedMonroe:  Complete Phase 2 of fire alarm upgrade.  Replace roofing system.

completedRichardson Memorial:  Replace flat roofing system.

completedSharp:  Plumbing phase 2 - Replace pipes and damaged fixtures

completedStern: Rooftop fume hood exhaust fan system (OEHS requirement)
       Change control air compressors

completedWarren: Replace hot water generator

completedWillow: Repairs to A/C at PJs








 

 